03.10.2012   11:06   +Feedback

Japan baut neues AKW

Electric Power Development Co. on Monday resumed construction of a nuclear plant in Aomori Prefecture, becoming the first power generation firm in Japan to make such a move since the disaster at the Fukushima Daiichi complex last year. With the nuclear crisis leading to the suspension of the project in the town of Oma, Masayoshi Kitamura, president of the wholesaler known as J-Power, said he expects the start of the plant’s operation to be delayed at least 18 months from the initially planned November 2014.

(Dr. Benny Peiser)


Permanenter Link | Druckversion

Kategorie(n): Ausland 

Helfen Sie uns Die ACHSE DES GUTEN noch besser zu machen
und auszubauen!

Spendenkonto
Kontonummer: 4801474
Augusta-Bank, Augsburg
Bankleitzahl 720 900 00
Internationale Bankleitzahl BIC GENODEF1AUB
Internationale Konto-Nr. IBAN DE27720900000004801474

Google-Anzeige